电解水制氢厂站经济性分析
徐进, 丁显, 宫永立, 何广利, 胡婷

Economic analysis of hydrogen production plant with water electrolysis
Jin XU, Xian DING, Yongli GONG, Guangli HE, Ting HU
表6 PEMEL技术路线各项成本在整个生命周期内的分布
Table 6 Cost distribution of PEMEL technology route throughout its life cycle
运行 年份土建年金/万元设备折旧/万元综合电耗/ (kWh/Nm3 H2)满负荷 产氢量/Nm3负荷率/%电价/ (元/kWh)电费/ 万元水耗/ (m3/Nm3H2)水价/ (元/m3)水费/ 万元人工费/万元维护费/万元总费用/万元
合计175013114220095008617809041929579284
1705255.1388038051000.522600.0014.13.6963.82888
2705255.1788038051000.522780.0014.13.61003.82910
3705255.2188038051000.522950.0014.13.61053.82932
4705255.2588038051000.523130.0014.13.61093.82954
5705255.2988038051000.523300.0014.13.61143.82977
6705255.3388038051000.523480.0014.13.61193.82999
7705255.3788038051000.523660.0014.13.61243.83022
8705255.4188038051000.523830.0014.13.61293.83045
9705255.4588038051000.524010.0014.13.61353.83068
10705255.4988038051000.524180.0014.13.61413.83092
11705255.5388038051000.524360.0014.13.61473.83115
12705255.5788038051000.524540.0014.13.61533.83139
13705255.6188038051000.524710.0014.13.61603.83164
14705255.6588038051000.524890.0014.13.61673.83188
15705255.6988038051000.525060.0014.13.61743.83213
16705255.7388038051000.525240.0014.13.61823.83238
17705255.7788038051000.525420.0014.13.61903.83264
18705255.8188038051000.525590.0014.13.61983.83290
19705255.8588038051000.525770.0014.13.62073.83316
20705255.8988038051000.525940.0014.13.62163.83343
21705255.9388038051000.526120.0014.13.62253.83369
22705255.9788038051000.526300.0014.13.62353.83397
23705256.0188038051000.526470.0014.13.62453.83425
24705256.0588038051000.526650.0014.13.62563.83453
25705256.0988038051000.526820.0014.13.62673.83482