储能科学与技术 ›› 2025, Vol. 14 ›› Issue (3): 1286-1298.doi: 10.19799/j.cnki.2095-4239.2024.1191

• 储能新锐科学家专刊 • 上一篇    下一篇

考虑充放电转换状态与功率约束的储能电站调频功率优化方法

孙利强1(), 党少佳1,2, 刘岗1, 王深友2, 胡鹏飞2()   

  1. 1.内蒙古电力科学研究院,内蒙古 呼和浩特 010020
    2.浙江大学,浙江 杭州 310000
  • 收稿日期:2024-12-16 修回日期:2025-02-15 出版日期:2025-03-28 发布日期:2025-04-28
  • 通讯作者: 胡鹏飞 E-mail:sunliqiang_223@163.com;hpf@zju.edu.cn
  • 作者简介:孙利强(1973—),男,本科,正高级工程师,主要从事新能源及储能方面技术研究,E-mail:sunliqiang_223@163.com

A frequency-modulation power optimization method for energy storage power stations considering the transition state of charge-discharge and power constraints

Liqiang SUN1(), Shaojia DANG1,2, Gang LIU1, Shenyou WANG2, Pengfei HU2()   

  1. 1.Inner Mongolia Electric Power Research Institute, Huhehot 010020, Inner Mongolia, China
    2.Zhejiang University, Hangzhou 310000, Zhejiang, China
  • Received:2024-12-16 Revised:2025-02-15 Online:2025-03-28 Published:2025-04-28
  • Contact: Pengfei HU E-mail:sunliqiang_223@163.com;hpf@zju.edu.cn

摘要:

针对储能电站单元群频繁转换充放电状态会降低电池寿命以及储能单元连接PCS(功率变换系统)传输功率偏小会违背国家能源管理并网标准的问题,提出一种考虑充放电转换状态与功率约束的储能电站调频功率优化方法。该方法通过将单元群划分为充、放电组分别承担充、放电需求,并在确保储能单元出力时对应PCS交流侧功率参考值不能低于设定下限值的原则基础上,根据AGC(自动发电控制)指令动态更新充放电组各单元,以此减少储能充放电状态转换次数。仿真算例表明,本文策略相比传统的分配策略,既能够减少调频成本,降低储能单元充放电转换次数,也能够计及国家并网标准,满足储能单元动作时,对应PCS交流侧功率不越限。

关键词: 储能单元, AGC, 调频成本, 充放电转换, 功率约束, 分配优化

Abstract:

Frequent charge-discharge cycles reduce the service life of energy storage power stations, and the transmission power of energy storage units connected to the power conversion system (PCS) may become too low, violating national energy management grid connection standards. To address this issue, this study proposes a frequency-modulation power optimization method for energy storage power stations that considers the transition state of charge-discharge and power constraints. This method divides the unit group into charging and discharging groups to meet their respective requirements. While ensuring that the alternating current (AC) power of the corresponding PCS does not fall below a set lower limit during energy storage unit output, each unit in the charging and discharging groups is dynamically updated based on the automatic generation control (AGC) instruction. This reduces the number of charge-discharge state transitions. Compared with traditional allocation strategies, the proposed strategy lowers frequency modulation costs and charge-discharge conversion frequency and ensures compliance with national grid connection standards by preventing the corresponding PCS AC side power from exceeding its limit during energy storage unit operation.

Key words: energy storage unit, AGC, frequency modulation cost, charge and discharge conversion, power constraint, distribution optimization

中图分类号: